MIP Engenharia operates throughout the national territory, offering complete solutions to its customers such as EPC (Engineering, Procurement, Construction) and Turn Key projects.
Below are some of our services:

  • Erection of metal structures;
  • Erection of mechanical and hydromechanical equipment;
  • Carbon steel, alloy, cast iron installations, among others;
  • Erection of equipment, electrical installations, instrumentation and automation;
  • Installation of refractories;
  • Erection of tanks, vases and boilermaking;
  • Field manufacturing (structures, pipes and boilers);
  • Industrial civil works;
  • Commissioning test on equipment;
  • Painting.

Get to know the works in progress.

333 VALE

Provision of industrial maintenance services and scaffold assembly and disassembly services in the operational areas of Vale units. Location: Parauapebas / PA

Read more

332 EQUINOX

Execution of civil works, infrastructure and electromechanical assembly services by the contractor to the contracting party, with the supply of labor, materials and equipment. Location: Santaluz/BA

Read more

330 VALE

Execution of electromechanical assembly services for the capacitation+10 – S11D project. Location: Canaã dos Carajás/PA

Read more

326 VALE

Execution of civil and electromechanical works for acoustic treatment of sieving buildings (Vargem Grande II) and filtering and grinding (DIPE). Location: Nova Lima / MG.

Read more

323 VALE

Civil Works Services in Conceição Reject Filtration S1823. Location: Itabira / MG.

Read more

322 VALE

Electromechanical erection for the Salobo III project – Plant – PM-0201 package. Location: Marabá / PA

Read more

319 VALE

Electromechanical Installation and Erection Services at plants 5 and 6 at the Tubarão unit. Location: Vitória / ES

Read more

329 VALE

Execution of Civil and Electromechanical Works for the Relocation of the Cb3 Elevator System – Mine Factory. Location: Ouro Preto / MG

Read more

328 VALE

Civil works and electromechanical assembly of systems for emergency launching of people through a conventional lifeline/overhead cable car at the Forquilhas I, II and III dams, at the factory mine. Location: Ouro Preto/MG

Read more

323.1 VALE

Tailings filtration assembly and disassembly services. Location: Mina de Conceição / Itabira

Read more

311 GERDAU

Erection of pipes and pumps of the Gas Washing System of the steelworks at the Ouro Branco Plant. Location: Ouro Branco / MG

Read more