MIP Engineering is a company that is part of the history of the development of Brazil. Specialized in execution of heavy industrial erection, in 58 years has become a leading country in its area of ​​operation. This special place is held by numbers that reveal their achievements: over 300 completed contracts, over 1,000,000 tons carried and major projects in progress.

MIP operates in mining, metallurgy, steel, petroleum, energy, pulp and paper, cement and others sectors. It works closely with companies that are benchmarks in their area of operation. Its customers are some of the largest companies in Brazil and the world: Vale, Usiminas, Petrobras, Gerdau, Samarco, Acesita, Votorantim, Cenibra, Novelis and Vallourec Group, among others.

With an experience accumulated over more than five decades together, MIP Engineering, practice technical competence, quality of execution services, economic and financial stability and respect for the safety of people and the preservation of the environment.

306 VALE

Optimization of Surge Pile at the Vargem Grande Mine. Electromechanical dismantling using two auxiliary crushers – Gama 1 and Gama 2 at the Capitão do Mato Mine. Mounting the 440TC86 belt conveyor at the Vargem Grande Mine. Períod: sep/17 a nov/18. Location: Nova Lima – MG

Veja mais

302 VALE

Civil and electromechanical erection of industrial support buildings (MRO), to be implanted in the plant, in the Ferro Carajás Project – S11D and erection of the Reactive Compensation System and Harmonic Filtering. Electromechanical erection in the Ferro Carajás Project – S11D. Location: Canaã dos Carajás – PA

Veja mais

301 VALE

Civil and electromechanical erection of the optimization of de-mudding of Vargem Grande II, and for PFF Vargem Grande II pumping at the Vargem Grande Mine. Period: dec/16 to jul/17. Location: Nova Lima – MG

Veja mais

298 VALE

Electromechanical erection of reclaimer RP-1520KN-01, disassembly of the reclaimer RP 152K-01, repotentializing of transporters TR-152K-01 and TR-152K-03 and relocation of water piping and spray adjacent to transporter TR 152K-03. Disassemblig the SLM System. Period: jun/16 to apr/17. Location: Parauapebas – PA

Veja mais

297 VALE

Civil and electromechanical erection for installation and adjustment of SPCI (System of Prevention and Fire Fighting) in the areas of Vale. Period: mar/16 to oct/17. Location: Nova Lima – MG l Itabirito – MG l Brumadinho – MG l Sarzedo – MG l Mariana – MG

Veja mais

296 VALE

Electromechanical erection of equipments within the Mine PIT, INPIT (Package 2101) in Carajás Project – S11D. Period: mar/15 to jul/17. Location: Canaã dos Carajás – PA

Veja mais

295 VALE

Electromechanical Erection Services for Vargem Grande Project – Reclaimer for Product Yard. Period: nov/14 to jul/15. Location: Nova Lima – MG

Veja mais

294 VALE

Electromechanical erection of adjustment patio machines (2094 package) and product patio machines (2095 package). Period: oct/14 to dec/16. Location: Canaã dos Carajás – PA

Veja mais

292 VALE

Electromechanical Erection Services for Wagon Loading System at TFA. Period: jun/14 to feb/15. Location: Rio Acima – MG

Veja mais

291 VALE

Electromechanical Erection Services for Vargem Grande Project – Package III. Period: mar/13 to feb/14. Location: Nova Lima – MG / Itabirito – MG

Veja mais

290 VALE

Electromechanical Erection Services of Units U-260 SSP/TSP (Acidulation and Granulation), U-280 DCP (Di-calcium Phosphate Plant), U-170 DF/DS (Defluorination and Desulforing of Phosphoric Acid), for Uberaba Industrial Complex. Period: nov/12 to jul/13. Location: Uberaba – MG

Veja mais

289 VALE

Civil Works and Electromechanical Erection Services of Dosing Scales and Adaption of Spessing Device of the Peletizing Plant, Vargem Grande Mine. Period: aug/12 to may/13. Location: Itabirito – MG e Nova Lima – MG

Veja mais

288 VALE

Civil Works and Electromechanical Erection Services of Water Captation System (Maravilhas II Dam) – Pico Mine, and Erectio of Piping System from Maravilhas II Dam to Vargem Grande Mine. Period: jul/12 to sep/13. Location: Itabirito – MG e Nova Lima – MG

Veja mais

287 SAMARCO

Pump Station VII (EB-VII) in Matipó. Period: mar/12 to feb/14. Location: Matipó – MG

Veja mais

286 SAMARCO

Electromechanical Erection Services for P4P Project (4th Pelletizing Plant) – 3rd Concentrator in Germano. Period: mar/12 to feb/14. Location: Mariana – MG e Ouro Preto – MG