Interconnection of the Upper West Basin to the Reservoir and Boqueirão Adduction System at the Ponta da Madeira Maritime Terminal.

Revitalization of the ST-314k-02 Sampling System – lines 1 e 2 of the Ponta da Madeira Maritime Terminal.

Electromechanical erection in the revitalization of the 820K-02 press line and, in general, of the assets that make up the 1N Pelletizing Plant, including the Fines / Feeding, Pelletizing / Stocking, Pressing, Mixing, Grinding and Receiving Thin.

Location: São Luís – MA